On 26.09.2024, BMF Port Burgas AD  held a closing event for the successful realization of the project „Black Sea Gateway to the OEM Transport Corridor. Studies for development of the basic infrastructure of the core port of Burgas”- 2020-BG-TMC-0014-S”.

The project is co-financed under the Connecting Europe Facility (CEF), Transport sector, and its total value is BGN 2 292 197,60.

The scope of the project includes:

  • Preparatory studies and surveys, environmental analysis, cost-benefit analysis and preparation of conceptual and technical designs for construction of a new pier on Berth 20A at port terminal Burgas East -2 in connection with the reconstruction and modernization of the liquid cargoes handling site;
  • Preparatory studies and surveys, environmental analysis, cost-benefit analysis and preparation of conceptual and technical designs for construction of a new quay wall of port terminal Burgas West in connection with the establishment of a new berth (Berth 29) and a general and dry bulk cargoes handling and storage site on the territory of the terminal.

The project aims to improve the port infrastructure in the port of Burgas (terminals Burgas East – 2 and Burgas West), creating modern and safer working environment and favorable investment climate for the economic development of the Burgas region. The sea access to the port will also be improved.